How to Write an Allulose RFQ That Suppliers Can Quote
Release time:
Nov 14,2026
Author:
Zhongda
Source:
Zhongda
An allulose RFQ should tell suppliers exactly which ingredient to quote, how much you intend to buy, where it must be delivered, and which technical and commercial conditions apply. Include a response format so procurement can compare offers without reconstructing each supplier's assumptions.
Zhongda is a leading Chinese natural-ingredient manufacturer with dedicated D-Allulose manufacturing and food application development capabilities. A well-prepared enquiry lets our team connect that industrial background with your required grade, sample plan, documentation and delivery schedule. This guide provides a usable RFQ structure and shows how to compare the quotations it generates.

Start with the purchase decision
State whether the enquiry is for a development sample, pilot order, first commercial purchase or repeat supply. These stages require different information. An estimated annual requirement helps a manufacturer understand the project, while the quantity being quoted establishes the immediate commercial scope.
Describe the finished food or beverage, manufacturing country and destination market. For a reformulation, explain the sugar-reduction objective, the ingredients being replaced and any ingredient-declaration constraints. Include processing conditions relevant to the proposal. This allows a technical team to discuss a suitable ingredient or customized sweetener system rather than guess what “best allulose” means.
Keep mandatory requirements distinct from preferences. For example, an approved ingredient composition may be essential, while a preferred pack size can be discussed. Ask the supplier to identify departures from your requirements explicitly.
Use these fields in the RFQ
| RFQ field | Information to provide | Required supplier response |
|---|---|---|
| Product identity | Pure D-allulose or a defined blend; powder, granules or syrup; relevant application | Proposed product code, composition, manufacturer and manufacturing site |
| Technical requirements | Attached specification revision, assay basis, relevant methods and handling requirements | Current grade specification and a separate list of deviations |
| Quantity and schedule | Sample requirement, order quantity, delivery window and nonbinding forecast | MOQ, order increments, available pack configuration and proposed timing |
| Delivery scope | Named destination, requested delivery rule and version, transport or handling constraints | Named place, included costs, exclusions and shipment assumptions |
| Quality and market documents | Required documents and the stage at which each is needed | Available records, applicable scope and any information requiring further review |
| Commercial conditions | Currency, quotation validity, payment proposal and response deadline | Unit-price basis, total quoted quantity, validity, payment terms and conditions |
| Change control | Requirement for notification of grade, site, composition or packaging changes | Agreed notification route and responsible technical or quality contact |
| Sample and receiving requirements | Trial quantity, delivery address and minimum remaining shelf life at receipt | Sample availability, any sample fee, freight responsibility, expected dispatch date and confirmation of the requested remaining shelf life |
The response should make an alternative offer visible. A supplier can propose a different pack or sweetener blend, but it should be identified separately from an offer against your requested specification.
Request commercial conditions for the specific proposal. A standard grade, customized specification and OEM program may have different minimum orders and lead times. Identify the program being quoted and ask for its conditions rather than applying one minimum across the full portfolio.
Remove ambiguity around the ingredient
Powder and syrup require different descriptions
For powder, identify the composition and the basis of the assay. Add particle or handling requirements only where they matter to your production process. “White powder” does not define a grade.
For syrup, request both its solids information and its allulose assay with units and reporting basis. A Brix figure and an allulose percentage measure different things. Include any receiving or dispensing constraints relevant to your plant. Do not treat a kilogram of syrup as interchangeable with a kilogram of powder in a purchasing comparison.
If you want suppliers to recommend the form, ask for separate proposals and state the formulation objective. Require each proposal to explain its composition, intended dosage and implications for your process. Keep those proposals outside a price comparison until the technical basis has been aligned.
Certifications need a defined requirement
If organic, Non-GMO Project verification, Halal or Kosher status is necessary, specify the exact requirement and destination market. Ask for evidence covering the proposed product and relevant entity. For FSSC 22000 or ISO requirements, identify the manufacturing site and certification scope you need to assess.
This makes the document request useful. An unrelated certificate cannot resolve a grade-specific requirement, and the presence of several logos does not establish that the quoted ingredient meets all of them. Give quality reviewers enough time to assess the applicable records before final selection.
Quote the current order and show the forecast separately
Distinguish a firm order quantity from an annual estimate. For a project still in development, state that the forecast depends on successful trials and internal approval. Ask suppliers to identify the assumptions behind price tiers or scheduling proposals.
Where deliveries will be split, provide the expected release pattern. A quotation for one shipment can have a different cost structure from several smaller releases. Include the required remaining shelf life at receipt if your organization has such a requirement, and ask the supplier to confirm whether the offered material can meet it.
Record what lead time means: material readiness, shipment departure or arrival at the named destination. Ask which milestones depend on sample approval, payment, production scheduling or transport arrangements. A single number without its starting point can create a false expectation.
Compare delivery terms on the same basis
Write the agreed Incoterms rule together with the named place and version. ICC's Incoterms rules allocate responsibilities, costs and risk between buyer and seller; the chosen rule needs to fit the actual transaction. Have the relevant purchasing and logistics teams review the arrangement. ICC Incoterms 2020
For comparison, request a clear breakdown of product price and any separately charged packaging, freight or other services. Record exclusions. Estimate other buyer costs consistently, using the same currency and conversion date where relevant. Do not assume that a delivered quotation includes every import, tax or receiving expense.
An illustrative quotation comparison
Training example only. These invented figures are not Zhongda prices, actual supplier quotations or a market benchmark. Assume two technically accepted offers cover the same powder grade and a 1,000 kg order. The buyer has aligned the delivery endpoint and identified the costs shown below.
| Comparable item | Offer A | Offer B |
|---|---|---|
| Product charge | 1,000 kg × USD 4.00 = USD 4,000 | 1,000 kg × USD 4.40 = USD 4,400 |
| Additional logistics cost included in this comparison | USD 600 | Included in the product charge |
| Comparable subtotal | USD 4,600 | USD 4,400 |
| Subtotal per kilogram | USD 4.60 | USD 4.40 |
The lower product-only price produces the higher subtotal in this example. Both offers still require the same review of excluded duties, taxes and other costs before a final purchasing comparison. A transparent subtotal is useful because the assumptions are visible, not because it guarantees the cheapest acceptable supplier.
Make Zhongda's manufacturing strengths part of the discussion
Zhongda's dedicated allulose line is designed for round-the-clock operation, according to our published manufacturing description. For procurement, the useful next step is to discuss production scheduling, batch identification and the delivery releases your project needs. Continuous-process capability provides industrial context; the confirmed quotation establishes the arrangements for your order. Zhongda allulose manufacturing and development
There is also a specific U.S. regulatory record behind our allulose business. On 6 July 2026, FDA issued a no-questions response to Zhongda's GRAS notice GRN 1309 for the D-psicose and intended uses described in that notice. Include your application and destination in the RFQ so the proposed ingredient and use can be matched to the relevant documentation. FDA response to GRN 1309
Zhongda’s allulose capabilities cover ingredient form, packaging and specification customization, alongside blends with stevia or monk fruit. Share the sweetness, texture, process and ingredient-declaration objectives together. Our technical consultation and formulation support can inform a defined proposal, while procurement confirms the grade, pack, order size and documents to be quoted. Zhongda D-Allulose portfolio
Where Non-GMO Project verification is required, state whether the offer should cover crystalline powder, granular material or syrup so our team can match it to the relevant Sweetism product entry and supporting record.

Copy this allulose RFQ template
Subject: RFQ for [allulose form and grade] for [application and destination]
We are evaluating [pure D-allulose / defined blend] for [finished product]. The manufacturing country is [country], and the destination market is [market]. Our project objective is [objective], with these essential composition or declaration requirements: [requirements].
Please quote [order quantity] for delivery to [named place and country] during [delivery window], using [requested Incoterms rule, named place and version]. Our nonbinding demand forecast is [volume and release pattern]. Please identify the proposed grade, manufacturing entity and site, pack configuration, MOQ and any order increments.
Our technical requirements are attached as [specification identifier and revision]. Please provide your current specification, a representative COA and the applicable quality or market documents listed in [document schedule]. State any deviations or proposed alternatives separately. For trial planning, please confirm [sample requirement], its grade identification and the documents that can accompany it. Please confirm sample availability, any sample fee, freight responsibility and the expected dispatch date. Our minimum remaining shelf life at receipt is [requirement]; please confirm whether the quoted material can meet it.
Please state the currency, unit-price basis, total product charge, included and excluded logistics costs, quotation validity, payment terms and how timing is calculated. Identify the contact for technical questions, specification changes and delivery discrepancies. Please respond by [date] and list any points that require clarification.
Replace the bracketed fields with your project details before sending. Attach a controlled specification when available; if the grade is still being selected, state which requirements are established and which need development support.
Review the response before selecting a supplier
Check the proposed code, specification revision, composition and manufacturing site before comparing totals. Then record document status, sample arrangements, commercial assumptions and open questions in the same review file. Obtain an updated quotation if a material requirement changes; avoid assembling a final offer from incompatible versions of emails and attachments.
Send your completed brief to Zhongda’s D-Allulose team to discuss the product, supporting records and quotation.
Recommend News




